Cost of Taras drewniany

PLN 21,240

Preliminary estimate from 2 mock sources. Real supplier prices land with the Price Aggregation release.

Last updated: July 27, 2026

T

Tomasz Stolarz

by Tomasz Stolarz

Steps

  1. 1

    Wytyczenie i niwelacja terenu

    Pomiar, wytyczenie obrysu, usunięcie darni, wyrównanie.

  2. 2

    Fundamenty punktowe

    Wkopanie/zalanie stóp fundamentowych lub bloczków betonowych.

  3. 3

    Konstrukcja legarów

    Montaż legarów w rozstawie 50cm, poziomowanie.

  4. 4

    Układanie desek tarasowych

    Mocowanie desek na klipsy lub wkręty tarasowe.

  5. 5

    Wykończenie i impregnacja

    Szlifowanie krawędzi, nałożenie olejów tarasowych.

Bill of materials

ItemQtyUnitBest priceSource
Deski tarasowe iglaste 28x145mm
70mPLN 12,390Leroy Merlin
Legary iglaste 45x95mm, impregnowane
50mPLN 8,850Leroy Merlin
Bloczki betonowe fundamentowe
12pieceprice unavailable
Wkręty tarasowe 4x50mm nierdzewne
400pieceprice unavailable
Klipsy tarasowe stalowe
140pieceprice unavailable
Folia kubełkowa / geowłóknina
22m2price unavailable
Olej tarasowy
5Lprice unavailable
Żwir pod fundamenty
0.5m3price unavailable

Per-store comparison

What you would pay if you bought everything from a single supplier.

  • CastoramaPLN 22,727

    Covers 2 of 8 items

  • Leroy MerlinPLN 21,240

    Covers 2 of 8 items

Template parameters

Builders can tweak these when applying the template — the BOM recalculates automatically.

Powierzchnia

20 m2 · 5–50

How we calculated this

Formula → rules → price lookup

1. Formula evaluation — Each BOM quantity is derived from the template's formula and your chosen dimensions (area, length, etc).

2. Rules — No adjustment rules applied to this build.

3. Price lookup — Cheapest current offer per item across tracked suppliers. Prices are preliminary until the Price Aggregation release.

FAQ

How accurate are these prices?

They are preliminary — generated by a stub model until the Price Aggregation release wires real supplier feeds. Treat them as a ballpark, not a quote.

Can I customize dimensions?

Yes — open the template and apply it to a project. You'll get a form for the declared parameters (area, length, etc) and the BOM recalculates automatically.

How is the waste factor applied?

Where a master has authored a waste-factor rule for a material, we add a percentage buffer (typically 10–20%) on top of the formula quantity. The exact rule and value are shown next to the affected row.

Apply this template