Cost of Altana ogrodowa 3x3m

PLN 19,524

Preliminary estimate from 2 mock sources. Real supplier prices land with the Price Aggregation release.

Last updated: July 27, 2026

T

Tomasz Stolarz

by Tomasz Stolarz

Steps

  1. 1

    Fundamenty punktowe (4 stopy)

  2. 2

    Słupy konstrukcyjne i rama podłogi

  3. 3

    Układanie podłogi

  4. 4

    Więźba dachowa

  5. 5

    Pokrycie dachu gontem bitumicznym

  6. 6

    Impregnacja i wykończenie

Bill of materials

ItemQtyUnitBest priceSource
Słupy drewniane 90x90mm (2.5m)
4piecePLN 708Leroy Merlin
Belki konstrukcyjne C24 80x160mm
28mPLN 4,956Leroy Merlin
Krokwie 45x120mm
40mPLN 7,080Leroy Merlin
Deski podłogowe iglaste 28x120mm
32mPLN 5,664Leroy Merlin
Deskowanie dachu OSB 15mm
14m2PLN 1,116Leroy Merlin
Gonty bitumiczne
16m2price unavailable
Papa podkładowa
16m2price unavailable
Bloczki betonowe fundamentowe
4pieceprice unavailable
Kotwy słupowe stalowe
4pieceprice unavailable
Wkręty i gwoździe ciesielskie
2BOXprice unavailable
Impregnat do drewna
10Lprice unavailable

Per-store comparison

What you would pay if you bought everything from a single supplier.

  • CastoramaPLN 20,890

    Covers 5 of 11 items

  • Leroy MerlinPLN 19,524

    Covers 5 of 11 items

How we calculated this

Formula → rules → price lookup

1. Formula evaluation — Each BOM quantity is derived from the template's formula and your chosen dimensions (area, length, etc).

2. Rules — No adjustment rules applied to this build.

3. Price lookup — Cheapest current offer per item across tracked suppliers. Prices are preliminary until the Price Aggregation release.

FAQ

How accurate are these prices?

They are preliminary — generated by a stub model until the Price Aggregation release wires real supplier feeds. Treat them as a ballpark, not a quote.

Can I customize dimensions?

Yes — open the template and apply it to a project. You'll get a form for the declared parameters (area, length, etc) and the BOM recalculates automatically.

How is the waste factor applied?

Where a master has authored a waste-factor rule for a material, we add a percentage buffer (typically 10–20%) on top of the formula quantity. The exact rule and value are shown next to the affected row.

Apply this template