Cost of Taras drewniany
PLN 21,240
Last updated: July 27, 2026
Tomasz Stolarz
by Tomasz Stolarz
Steps
- 1
Wytyczenie i niwelacja terenu
Pomiar, wytyczenie obrysu, usunięcie darni, wyrównanie.
- 2
Fundamenty punktowe
Wkopanie/zalanie stóp fundamentowych lub bloczków betonowych.
- 3
Konstrukcja legarów
Montaż legarów w rozstawie 50cm, poziomowanie.
- 4
Układanie desek tarasowych
Mocowanie desek na klipsy lub wkręty tarasowe.
- 5
Wykończenie i impregnacja
Szlifowanie krawędzi, nałożenie olejów tarasowych.
Bill of materials
| Item | Qty | Unit | Best price | Source |
|---|---|---|---|---|
Deski tarasowe iglaste 28x145mm | 70 | m | PLN 12,390 | Leroy Merlin |
Legary iglaste 45x95mm, impregnowane | 50 | m | PLN 8,850 | Leroy Merlin |
Bloczki betonowe fundamentowe | 12 | piece | price unavailable | — |
Wkręty tarasowe 4x50mm nierdzewne | 400 | piece | price unavailable | — |
Klipsy tarasowe stalowe | 140 | piece | price unavailable | — |
Folia kubełkowa / geowłóknina | 22 | m2 | price unavailable | — |
Olej tarasowy | 5 | L | price unavailable | — |
Żwir pod fundamenty | 0.5 | m3 | price unavailable | — |
Per-store comparison
What you would pay if you bought everything from a single supplier.
- CastoramaPLN 22,727
Covers 2 of 8 items
- Leroy MerlinPLN 21,240
Covers 2 of 8 items
Template parameters
Builders can tweak these when applying the template — the BOM recalculates automatically.
How we calculated this
Formula → rules → price lookup
1. Formula evaluation — Each BOM quantity is derived from the template's formula and your chosen dimensions (area, length, etc).
2. Rules — No adjustment rules applied to this build.
3. Price lookup — Cheapest current offer per item across tracked suppliers. Prices are preliminary until the Price Aggregation release.
FAQ
How accurate are these prices?
They are preliminary — generated by a stub model until the Price Aggregation release wires real supplier feeds. Treat them as a ballpark, not a quote.
Can I customize dimensions?
Yes — open the template and apply it to a project. You'll get a form for the declared parameters (area, length, etc) and the BOM recalculates automatically.
How is the waste factor applied?
Where a master has authored a waste-factor rule for a material, we add a percentage buffer (typically 10–20%) on top of the formula quantity. The exact rule and value are shown next to the affected row.